Crown Casino Security Bollards

Hostile Vehicle Mitigation

About the Project

MG were engaged by Crown to upgrade security bollards and replacement of various pavements.

Two hundred and fifty Bollards were required to be core drilled and installed through the concrete slab with services and above the basement car park.

Works were completed over winter in various locations and entrance around the Casino

The work was also completed in stages over a 3-month period.